World processing programs producer streamlines workflows with iLogic and FDU

As probably the most greatest commercial processing programs providers on the planet, Dusseldorf, Germany-based GEA makes the machines that make the goods we use on a daily basis, from the meals and drinks in our grocery carts to the drugs our medical doctors prescribe to the gasoline in our automobiles. Those come with each same old programs and customized, made-to-order answers.

The latter are advanced with iLogic, a specialised set of equipment inside of Autodesk® Inventor® founded round rules-driven design.

Huge-scale processing programs use most of the identical varieties of parts—compressors, pumps, valves, controllers, mixers, homogenizers—in distinctive configurations. The iLogic equipment permit GEA engineers to create a “parametric skeleton” that normal product groups can then regulate to create new fashions routinely.

Man standing beside industrial equipment in a factory
Lune Reizebos, Software Specialist for GEA’s OneEngineering crew. Symbol courtesy of GEA.

“We meet frequently with the mavens who perceive all of the intricacies of a selected procedure and the GEA system for that procedure,” says Lune Riezebos, Software Specialist in Carrier Supply with GEA. “They provide an explanation for what parameters they’ve, and that’s all we wish to construct a style that they may be able to regulate and change into many alternative configurations routinely.”

Through the years, this creates a library of parts that may be repurposed repeatedly over, creating standardized merchandise for customized eventualities with out going thru a lengthier, extra conventional customization procedure.

“We will create a brand new style in 2 hours as a substitute of three weeks,” Riezebos says. “Relying at the complexity of the device, they may be able to minimize engineering time anyplace from 30% to 80%. That makes it a lot more uncomplicated to fulfill shoppers’ wishes.”

However the corporate quickly learned its new method got here with an surprising problem.

The gross sales cycle for massive processing programs can also be lengthy since the buyer and GEA are working out learn how to remedy a brand new downside. On the identical time, GEA will have to use its engineering sources properly, so it was once no longer at all times imaginable to expand an entire three-D style of an answer prior to the buyer signed the contract.

To bridge the space, gross sales groups had been creating 2D layouts with AutoCAD® all through the preliminary segment of the gross sales cycle. Engineers would then recreate those layouts in three-D with Inventor after the sale was once showed. This ended in an excessive amount of duplicated effort. It additionally created some uncomfortable scenarios when the gross sales crew inadvertently created 2D device layouts that might no longer be manufactured as specified. This was once an unanticipated results of well-intentioned gross sales groups responding to buyer requests for adjustments prior to the engineering crew become concerned.

“We had labored out some way for the gross sales groups to construct programs by means of hanging in combination ‘blocks’ in AutoCAD,” says Martin Andersen, Senior Supervisor Design Engineer for GEA. “However it was once too simple to modify sides that shouldn’t be modified. After we reached the challenge segment and started redrawing the whole thing from scratch, we needed to inform the shoppers that what they signed off on may just no longer in truth be achieved.”

Whilst Andersen’s crew may just at all times amend the three-D structure to fulfill the buyer’s wishes, the disconnect introduced pointless pressure and prolong into the method. That’s when the engineering crew learned a a lot more environment friendly approach was once already to be had within the Autodesk Product Design and Production Assortment.

Because it became out, the solution was once Manufacturing facility Design Utilities—most effective to be had within the Product Design and Production Assortment. It might probably hyperlink 2D layouts created in AutoCAD with three-D fashions. In different phrases, Manufacturing facility Design Utilities allowed the GEA crew to create 2D and three-D layouts concurrently and stay them in sync with each and every spherical of adjustments.

See how this realization no longer most effective helped GEA dramatically scale back the time all for three-D structure manufacturing but additionally make all the gross sales cycle extra environment friendly.

Learn the whole tale now and be told extra about the newest options in Manufacturing facility Design Utilities.